Once the lines all pass the pressure test, we will then move on to the decks phase. At this time we will form up your surrounding pool deck per the specifications in the pool plans and lay steel rebar for structural stability. We will also install the deck drains and run them to where the natural drainage of the yard is. We will then pour concrete around the pool and up to the pool coping and forms.
Thank you for reaching out. A member of our team will be in touch soon!